IP-2 (1905, 1906) Previous
Back
Up
Up
Next
Next
 
The IP-2 meter combined the two halves of the IP into one unit - the Type I meter and the Form 3 prepayment device. As with the combined version of the Fort Wayne K prepayment meter, the prepayment device was operated by the meter register instead of a contact device and coil as in the Type IP. IP-2 prepayment
GE prepayment meter pamphlet